FOB Price
Get Latest Price|
- Minimum Order
Country:
USA
Model No:
Wellness Center
FOB Price:
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
Product Group :
-
Contact Person Nicole
5500 Military Trail, 22-121, Jupiter
Our Modular Hospital design also eliminates many of the services that result in enormous costs in terms of space and personnel. Food service is accomplished using prepackaged meals warmed, served, and disposed of by the internal personal rather than a central kitchen and dining area. Similarly, the need for laundry service including soiled utility spaces is eliminated by the use of non-woven disposable fabrics for bed linens, gowns and scrubs. These products can be provided at a fraction of the cost of traditional woven equivalents.
The efficiency of form extends to the structural system. By utilizing repetitive steel frames, our Modular Hospital can be constructed very quickly with minimal opportunities for error. In addition, the common frame shape allows for ease of handling, packaging, and shipping to the end user. With site preparation and foundations completed, our modular hospital can be erected and operational in approximately two months.
In summary, our Modular Hospitals can be constructed, equipped, and operated at a fraction of the cost of a traditional hospital with long term operational savings sufficient to recoup the initial cost of construction within the first ten years of operation.
Country: | USA |
Model No: | Wellness Center |
FOB Price: | Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | - |
Minimum Order Quantity: | - |
Packaging Detail: | - |
Delivery Time: | - |
Supplying Ability: | - |
Payment Type: | - |
Product Group : | - |